
Rattan Rolling RAL Color Vertical Steel Mobile Pedestals
Contact Person : Alice Xiao
Phone Number : +86-15038533682
WhatsApp : +8615038533682
Minimum Order Quantity : | 50 Pieces | Price : | negotiable |
---|---|---|---|
Packaging Details : | 1pcs 1 carton, Assembled | Delivery Time : | 15-35 days |
Place of Origin: | Henan Province, China | Brand Name: | CBNT |
---|---|---|---|
Certification: | ISO2015/ SGS | Model Number: | WK-H3 |
Detail Information |
|||
Feature: | Movable Pedestals | Material: | Metal Steel |
---|---|---|---|
Product Name: | Metal Drawer Cabinet | Structure: | Assembled Structure |
Thickness: | 0.5-1.0mm | Surface: | Environmental Powder Coated |
Color: | RAL Color,Customized | Warranty: | About 3 Years |
Finish: | Environmental Epoxy Powder | Package: | 1 Pcs A Carton |
Selling Units: | Single | Single Package Size : | 120*60*75 Cm |
Single Gross Weight: | 55 KG | Package Type: | Carons/wooden |
High Light: | Electrostatic Spraying Fireproof Pedestals,Waterproof Fireproof Pedestals,Electrostatic Spraying metal office pedestal |
Product Description
Electrostatic Spraying Waterproof Mobile Fireproof Pedestals Steel Metal
PRODUCT SPECIFICATION | |
Item No. | WK-H3 |
Brand | CBNT |
Size | W1050*D500*H600mm |
PACKING | |
Packing volume | 0.361CBM |
Packing | Five layers wooden paper/ Foam paper/ EPE/ Foam blocks/ Packing belts |
Color | RAL Color;Our Own Colors ;Specified by thhe Customers |
Thickness Regular | Regular 0.5-1.2mm offered |
CERTIFICATIONS | |
ISO9001;ISO45001;ISO18001 Or according to customers’ demand. |
PRODUCTS ADVANTAGES
* Cushion is used to reduce friction and noise.
* 4 adjustable shelves are standard configuration.
* Reinforcing rib welded on the back of shelves and doors.
* The folded craft makes the edge more solid and thicker.
* The rubber belt and fixer reduce glass shaking and breakage probability.
SUPPLY ABILITY AND TRADING TERMS
Terms of payment
1. Small quantity for trail order allowed
2. Production Ability 20000sets/month
3. Small quantity for trail order allowed
4. T/T,30% deposit in advance, the balance opon the B/L copy
Lead-time
1. Peak time15-20days, leisure time 20-35days after receiving your deposit
Enter Your Message